Transport Canada’s Arctic drone project delayed 2 years by arms-control rules

SeaHunter UAV

Transport Canada had hoped to augment its manned surveillance flights in the Arctic with an unmanned aerial vehicle, or drone, by next spring. But the $39.5-million project has hit an international roadbump in the form of an arms-control deal, which will delay the deployment until at least 2020.

Share This Post